Hardstand Replacement Minimal Downtime

Don Watson Transport needed to replace a heavily worn 1,200 m² asphalt hardstand with a new, heavy-duty concrete solution to support their high-traffic, refrigerated logistics operation.

We replaced the original asphalt surface that had deteriorated under the weight and frequency of transport activity, with a high-performance hardstand comprising:

  • 180mm thick, 40MPA concrete

  • Double-layer reinforcement mesh

  • Full excavation, subgrade preparation, compaction, formwork, steel fixing, placement, and finishing

The result is a durable, long-life hardstand built to withstand the demands of heavy vehicles and round-the-clock operations. Delivered on time despite adverse weather.